Project: LOCKER ROOM MOD & INTERIM HOUSING AT ARCADIA HS

Bid due date: 05/14/2025 @02:00 PM PST - Pacific Standard Time - Zone U
Subcontractor Bids due By: 05/13/2025 12:00 PM
Project Description :

THE MANUFACTURER (OR PORTABLE/MODULAR PROVIDER) SHALL PROVIDE ALL LABOR AND
MATERIALS PER PLAN UNLESS STATED OTHERWISE IN WRITTEN EXECUTED CONTRACT
BETWEEN THE DISTRICT (OR OWNER). REFER TO THE GENERAL SPECIFICATIONS ON SHEET A0.1.
CHANGES TO PLAN OR SCOPE OF WORK - NO ADDITIONAL WORK OR RE-WORK SHALL BE
COMMENCED BY THE MANUFACTURER UNLESS STATED OTHERWISE IN WRITTEN EXECUTED
CONTRACT BETWEEN THE DISTRICT (OR OWNER). HERE-SAY, TEXT MESSAGES, EMAILS
AND SOCIAL MEDIA ARE NOT CONSIDERED WORK AUTHORIZATION. REFER TO THE GENERAL
SPECIFICATION SHEET ON SHEET A0.1 FOR ADDITIONAL INFORMATION
THE DESIGN AND SCOPE OF WORK OF THE INCOMING SITE INSTRASTRUCTURE TO THE
PORTABLE/MODULAR BUILDING SUCH AS POWER, WASTE, WATER, COMMUNICATION, AND
FIRE ALARM ARE BY DISTRICT (OWNER). REFER TO THE GENERAL SPECIFICATION SHEET ON
SHEET A0.1 FOR ADDITIONAL INFORMATION REGARDING WORK NOT INCLUDED

Project Estimate : $ 10000000.00
Architect : TBP/ARCHITECTURE